Dept. 3.2.1 Mechanical Engineering University and Old Clinic

Fields of activity

Operation and maintenance in the Old Town, Old Clinic, Theoretical Centre / Institutes in Neuenheimer Feld:

  • Mechanical systems (heating, ventilation, air conditioning, sanitary facilities)
  • 4 drinking water transfer stations in the old hospital and Neuenheimer Feld
  • 3 service water well systems in Neuenheimer Feld
  • Technical outdoor facilities (drinking water, service water, waste water, natural gas networks as well as above-ground hydrants and emergency exit supply corridors) in the old clinic and throughout Neuenheimer Feld
  • Implementation of renovation measures within the scope of the indirect discharger ordinance for wastewater pipes in the area of the hospital
  • Façade access systems, roof cable safety systems and securants in the area of the hospital (surgery, head clinic, medical clinic, administration building, paediatric clinic, NCT, new pathology building, new surgery building)
  • Planning and implementation of refurbishment measures in the old hospital in the areas of heating, ventilation, air conditioning and sanitation
  • Implementation and cost tracking for small-scale measures in the DAW area for the entire university area (old town, old clinic, Neuenheimer Feld) - total amount: approx. 700,000 EUR per year

Technical machine inspection:

  • Regular inspection of the BSK, digestors, safety cabinets, wall hydrants, pressure vessels, emergency exits, above-ground hydrants, etc. in the area of the university and in the old medical centre
  • Regular inspection of the façade access systems, roof rope safety systems, safety edges in the hospital area

New construction - refurbishment - remodelling projects in the university and hospital areas:

  • Technical advice, planning specifications, complete takeover after completion of the technical facilities and monitoring of warranty defects

Neuenheimer Feld :

  • Building 366, pharmacology, 2nd BA (2nd floor with bridges) and 3rd BA (basement to 1st floor)
  • Building 364, Pharmacology, 3rd BA (1st floor, ground floor and part of basement)
  • Building 344, Centre for Integrative Infectious Disease Research (CIID) new building
  • Building 368, ZITI, 4th and 5th floors
  • Building 282, extension 5th floor
  • Building 230, 3rd BA
  • Building 360, Botanical Institute Renovation of climate chambers
  • Building 289, new lecture theatre and learning centre (HLZ),
  • Building 294, heiCOMACCS
  • Building 293, University Computer Centre
  • Building 225, EINC (European Institute for Neuromorphic Computing Heidelberg) (formerly HBP)
  • Building 246, IMSE (Institute for Molecular Systems Engineering)
  • Building 345, EMCF, UG, (concept merging)
  • Building 348, GEO - laboratory extension, 1st floor
  • Building 272, new Chemical Institute building

Old town:

  • Building 2040, college building, refurbishment
  • Building 2050, Heuscheuer, 2nd BA, refurbishment (new ventilation system)
  • Building 2100, Triplex, new refrigeration system, 2nd recooling plant, compressors etc.

Old clinic:

  • CATS (Centre for Asian and Transcultural Studies), new building
  • Building 4310, east wing, mixed university and student union building with canteen
  • Building 4360, Prinzhornsammlung, new air conditioning system, clinic project
  • Defect tracking as part of the warranty
  • Building 225, CAM
  • Building 205, Mathematikon, Component A
  • Building 344 (CIID)
  • Building 253, 3rd floor (Physics Institute)

Management

Heiko Lampert


+49 6221 56-7215